We executed the following works at this project :-
-
- Backfilling
- Steel work
- Fencing
- Mechanical work
- Portable cabin supply
- Electrical work
- Generator supply
- Block plaster tiling
- Gypsum work
- Exterior insulation and finishing system (EIFS)
- Trunking
- Cable tray installation
- Cable pulling
- Main distribution board (MDB) installation
- Installation and removal of all electrical fittings
- Fabrication of steel structures
- Erection of steel structures